As a result of the changes introduced by EU GMP Annex 1 on the Manufacture of Sterile Medicines and despite the fact that it has not yet been finally approved as of today, some pharmaceutical laboratories with sterile production have decided to move towards its compliance beforehand.
Although it may seem premature, given that the regulations have not yet been definitively enacted, it is clear that moving towards their implementation is highly beneficial as they are an improvement on current practices which are already applied by large reference laboratories today. Taking into account that the drafts of the new regulations do not usually vary significantly from the later official versions, proceeding before the new requirements are adopted is a prudent measure, which allows sufficient time for planning the actions that must be carried out to update procedures and practices, and to organize the investments that must be undertaken to adapt to the latest technologies.
This article illustrates how the new requirements specified in the current draft of Annex 1 have been implemented in a pharmaceutical laboratory that wanted to anticipate its entry into force, by applying a methodology based on the in-depth assessment of its facilities and its quality management system with regards to the new requirements, and culminating in the elaboration of an action plan that allows for correcting and solving the deviations and deficiencies observed.
Un estudio con datos de los últimos 35 años, ind...
Un equipo de investigadores de la Universidad Juli...
A new technique allows the design of solid materia...
En nuestro post hablamos sobre este interesante tipo de célula del si...
Han desarrollado un estudio para evaluar la correlación entre el teji...
Portal de biotecnología en España
¡Suscríbase a nuestro newsletter para estar al día con las últimas noticias y ofertas!
2013 © Biotech-Spain.com - Site Developments SL. Todos los derechos reservados. Terminos y Condiciones | Política de Privacidad
Articles
Directory